Engineering Projects

Project Number 2017 Project Name Start Date End Date

MQ13-030

Wright Street Reconstruction (Sugarloaf Avenue to Industrial Drive)
Roundabout Location
(Intersection of Wright Street & Sugarloaf Avenue)

Project Engineer: Keith Whittington

Inspector: Dan Salmon

Drawings: Drawing 1

Contractor:Hebert Construction Company
107 4th Avenue Iron River, MI 49935
http://www.hebertconstructionco.com/
1-906-265-5157

May November
MQ13-235

Wilson Street Reconstruction

(McClellan Avenue to Ward Street)
Project Engineer: Jim Compton
Inspector: Jim Compton

Drawings:Drawing 1

Contractor: Smith Paving Inc
4090 US41 W. Marquette, MI 49855
http://smithpaving-mi.com/
1-906-228-7285

June October

MQ15-020

Marquette Hospital Transportation Improvements Project
Roundabout Locations
(Intersection of US41 & Grove Street)
(Intersection of US41 & New Hospital Entrance)
(Intersection of Baraga Avenue & New Hospital Entrance)

Project Designee: Keith Whittington

Inspector: Mikael Kilpela

Drawings:Drawing 1 Drawing 2

Contractor:BACCO CONSTRUCTION COMPANY
PO Box 458 (mailing address)
N3676 North US-2
Iron Mountain, Michigan 49801
Phone: 906-774-2616
Fax: 906-774-1160
www.baccocc.com

May November
MQ16-000

SAW Grant
(Wastewater & Stormwater Asset Management Plans, Stormwater Management Plan)

Project Engineer: Matthew Koss
Inspectors: Riley Powers
Evan Bartus
Tom Sofka

Spring Fall
MQ17-015

CR550 Dead River Bridge Maintenance
(Multi Use Path Bridge Concrete Repair)

Project Engineer: Jim Compton
Inspector: Jim Compton

Drawings:
Contractor:

August
MQ17-018

Sidewalk Replacement, Repair, and Altamont Street Sidewalk Extension Project
(Throughout City Limits)

Project Engineer: Keith Whittington

Inspector: Matthew Koss

Drawings:Drawing 1 Drawing 2

Contractor:Premeau Construction, Inc.
http://premeauconstruction.com/about.htm
1-906-932-4314

May September
MQ17-020

Presque Isle Avenue Reconstruction
(College Avenue to Fair Avenue)
Roundabout Location
(Intersection of Presque Isle Avenue and Fair Avenue)

Project Engineer: Keith Whittington
Inspector:Dan Salmon

Drawings:Drawing 1

Contractor:Contractor: Hebert Construction Company
107 4th Avenue Iron River, MI 49935
http://www.hebertconstructionco.com/
1-906-265-5157

June November
MQ17-021

Fair Avenue Reconstruction
(McClellan Avenue to City Limits)

Project Engineer: Jim Compton
Inspector:Jim Compton

Drawings:Drawing 1

Contractor: Smith Paving Inc
4090 US41 W. Marquette, MI 49855
http://smithpaving-mi.com/
1-906-228-7285

June November
MQ17-101
MQ17-303

SIMP & Sanitary Sewer Lateral Replacements
(Throughout City Limits)

Project Engineer: Mikael Kilpela
Inspector: Jared Kangas Drawings:Drawing 1

Contractor:

July October
MQ17-102

Gravel Street Upgrades
(Jefferson Street, Hancock Street, Sherman Street)

Project Engineer: Keith Whittington
Inspector: Jared Kangas

Drawings:Drawing 1 Drawing

Contractor:

July October
MQ17-105

Traffic Signal Upgrade
(Front Street / Spring Street)
Project Engineer: Keith Whittington
Drawings:

Contractor:

MQ17-106

Traffic Markings Line Painting
(Throughout City Limits)

Project Engineer: Keith Whittington
Inspector: Dan Salmon

Drawings:

Contractor:

July September
MQ17-401

Sanitary and Storm Sewer Cleaning and Televising Contract
(Throughout City Limits)

Project Engineer: Keith Whittington

Drawings:

Drawing 1

Contractor:

UP Rubber Co
2101 North 19th Street Building B Escanaba, MI 49829
http://www.uprubber.com/
1-906-786-0460

Early Spring Late Fall
MQ17-403

US41 Wetlands Mitigation
(Presque Isle Bog Area)

Project Engineer: Keith Whittington

Inspector: Jim Compton

Drawings:

Contractor: BACCO CONSTRUCTION COMPANY

PO Box 458 (mailing address)

N3676 North US-2

Iron Mountain, Michigan 49801

Phone: 906-774-2616

Fax: 906-774-1160

June September
Project Number 2016 Project Name Start Date End Date

MQ15-301
MQ15-402

Sanitary and Storm Sewer Cleaning and Televising Contract
Project Engineer: Keith Whittington 

Drawings:
Drawing 1

Contractor:
UP Rubber Co
2101 North 19th Street Building B Escanaba, MI 49829
http://www.uprubber.com/
1-906-786-0460

Late May

Summer
2017

MQ15-017

DDA South Front Streetscape Upgrade (100 and 200 Block)
Project Engineer: Greg Borzick  
Inspector: Greg Borzick 

Drawings:
Drawing 1

Contractor:
Premeau Construction, Inc.
http://premeauconstruction.com/about.htm 
1-906-932-4314

Late May July
MQ15-018

Sidewalk Replacement, Repair, and Extension Project
Project Engineer:  Greg Borzick
Inspector: Greg Borzick

Drawings:
Drawing 1

Contractor:
Premeau Construction, Inc.http://premeauconstruction.com/about.htm 
1-906-932-4314

Late May September
MQ15-019

Altamont Street Sidewalk Extension
Project Engineer:  Greg Borzick
Inspector:  Greg Borzick

Drawings:
Drawing 1
Drawing 2

Contractor:

Premeau Construction, Inc.
http://premeauconstruction.com/about.htm 
1-906-932-4314

June September
MQ15-106

Traffic Markings Line Painting
Project Engineer: Keith Whittington
Inspector:  Dan Salmon 

Drawings:
Drawing 1

Contractor:
PK Contracting, Inc.
6344 Blue Road M-55 Lake City, MI 49651
http://www.pkcontracting.com/contact/nothern-michigan/
1-231-839-4430

June August
MQ15-101
MQ15-303

SIMP & Sanitary Sewer Lateral Replacements
Project Engineer: Mikael Kilpela
Inspector: Mikael Kilpela
Drawings:

Contractor:
June September
MQ14-105

Lincoln Avenue and College Avenue Traffic
Signal Upgrade
Project Engineer: Mikael Kilpela
Inspector:  Mikael Kilpela
Drawings:

Contractor:
June Later August
MQ13-023

Saint Lusson Drive Reconstruction
Project Engineer: Keith Whittington
Inspector: Dan Salmon

Drawings:
Drawing 1

Contractor:
Smith Paving Inc
4090 US41 W. Marquette, MI 49855
http://smithpaving-mi.com/
1-906-228-7285

June September
MQ13-024

Jonathan Carver Road Reconstruction
Project Engineer: Keith Whittington
Inspector: Dan Salmon

Drawings:
Drawing 1

Contractor:
Smith Paving Inc
4090 US41 W. Marquette, MI 49855
http://smithpaving-mi.com/
1-906-228-7285

June September
 MQ13-026

Spring Street Reconstruction (Third to Fifth)
Project Engineer: Keith Whittington
Inspector: Jim Compton

Drawings:
Drawing 1

Contractor:
Smith Paving Inc
4090 US41 W. Marquette, MI 49855
http://smithpaving-mi.com/
1-906-228-7285
June July
Project Number 2015 Project Name Start Date End Date
MQ50-018 Hawley Street Bike Path Extension
Project Engineer: Keith Whittington
Inspector: Jared Kangas
Contractor:
Smith Paving Inc
4090 US41 W. Marquette, MI 49855
http://smithpaving-mi.com/
1-906-228-7285
Drawings:
Drawing 1
Drawing 2
Drawing 3
Drawing 4
Drawing 5
Drawing 6
Drawing 7
Drawing 8
Drawing 9
Contractor:
July 7, 2015 Aug 15, 2015
MQ14-500 Presque Isle Marina Phase 2
Project Engineer: Jim Compton 
Inspector: Jim Compton
Contractor:
Lindberg & Sons, Inc.
599 Washington Street Ishpeming, MI. 49849
http://lindberginc.com/
1-906-486-4459
Drawings:
Drawing 1
Drawing 2
Drawing 3
Drawing 4
Drawing 5
Drawing 6
Drawing 7
Drawing 8
Drawing 9
Contractor:
Summer Fall
MQ14-302 Sanitary Sewer Root Control Contract
Project Engineer: Keith Whittington
Inspector: Jared Kangas
Contractor:
Dukes Root Control Inc.
1020 Hiawatha Blvd. West.
Syracuse, NY 13204
Ph: 315-472-4781
Fax: 315-475-4203
March 30, 2015 Sept 26, 2015
MQ14-301 Sanitary Sewer Cleaning and Televising Contract
Project Engineer: Keith Whittington 
Inspector: Jared Kangas
Drawings:
Drawing 1
Contractor:
Contractor:
UP Rubber Co
2101 North 19th Street Building B Escanaba, MI 49829
http://www.uprubber.com/
1-906-786-0460
July 13, 2015 Spring
MQ14-017 DDA Washington Streetscape Upgrade (200 Block)
Project Engineer: Greg Borzick 
Inspector: Jared Kangas
Drawings:
Drawing 1
Drawing 2
Drawing 3
Drawing 4
Contractor:
Arrow Constructions
422 US-41 E
Negaunee, MI 49866
April 27, 2015 July 31, 2015
MQ15-306 UPG Sanitary Sewer Lift Station
Project Engineer: 
Inspector:
Drawings:
Drawing 1
Drawing 2
Drawing 3
Drawing 4
Drawing 5
Drawing 6
Drawing 7
Drawing 8
Contractor:
Fall Fall
MQ14-106 Traffic Markings Line Painting
Project Engineer: Keith Whittington
Inspector: Jared Kangas
Drawings:
Contractor:
PK Contracting, Inc.
6344 Blue Road M-55 Lake City, MI 49651
http://www.pkcontracting.com/contact/nothern-michigan/
1-231-839-4430
SummerSummer
MQ14-101
MQ14-303

SIMP & Sanitary Sewer Lateral Replacements
Project Engineer: Keith Whittington
Inspector: Mikael Kilpela
Contractor:
Payne & Dolan Inc. 
N3W23650 Badinger Road 
PO Box 781 
Waukesha, WI 53187 
Phone - (262) 524-1700 

Drawing 1
Drawing 2

Summer Fall
Project Number 2014 Project Name Start Date End Date
MQ14-017

DDA Washington Streetscape
Project Engineer: Greg Borzick
Inspector: Jared Kangas / Dan Salmon

Drawings:
Drawing 1
Drawing 2

Spring Completed
MQ13-306

Carp River Sanitary Sewer Crossings
Project Engineer: Jim Compton
Inspector: Jim Compton

Drawings:
Drawing 1
Drawing 2

Spring Completed
MQ13-302

Sanitary Sewer Root Control Contract
Project Engineer: Keith Whittington
Contractor
Duke's Root Control, Inc.
1020 Hiawatha Blvd. West.
Syracuse, NY 13204
Ph: 315-472-4781
Fax: 315-475-4203

Drawings:
Drawing 1

Spring Completed
MQ13-301

Sanitary Sewer Cleaning and Televising Contract Project Engineer: Keith Whittington
Contractor:
UP Rubber Co
(906) 786-0460
PO Box 541 Escanaba, MI 49829

Drawings:
Drawing 1

Spring Completed
MQ13-018

Sidewalk Replacement & Repair
Inspector: Jared Kangas
Contractor:
U.P Concrete
1438 U.S. 2-41 P.O Box 25 Bark River, MI 49807 . 
http://www.upconcrete.com/
1-906-466-7400

Drawings:
Drawing 1

Spring Completed
MQ13-020

Hewitt Avenue Reconstruction
Inspector:
Mikael Kilpela
Contractor:
Oberstar, Inc
1900 Industrial Parkway
Marquette, MI 49855
(906) 226-6799)

Drawings:
Drawing 1
Drawing 2
Drawing 3
Drawing 4

Spring Completed
MQ14-101

Street Improvement Projects (SIMP) & Street Crack Filling & Sanitary Sewer Lateral Replacements
Inspector: Mikael Kilpela
Contractor:
Payne & Dolan Inc. 
N3W23650 Badinger Road 
PO Box 781 
Waukesha, WI 53187 
Phone - (262) 524-1700 

Drawings:
Drawing 1
Drawing 2
Drawing 3
Drawing 4

Spring Completed
  MQ13-202

Horizons Drive Watermain Extension
City Engineer: Keith Whittington
Inspector: Jared Kangas
Contractor:
Smith Paving Inc
4090 US41 W. Marquette, MI 49855
http://smithpaving-mi.com/
1-906-228-7285

Drawings:
Drawing 25

Spring Completed
MQ14-101

Mite, Hogans Alley, and West Furnace
City Engineer: Keith Whittington
Inspector: Dan Salmon 
Contractor:
Smith Paving Inc
4090 US41 W. Marquette, MI 49855
http://smithpaving-mi.com/
1-906-228-7285

Drawings:
Drawing 3
Drawing 4
Drawing 7
Drawing 13

Spring Completed

Westland Drive Reconstruction
Inspector: Jared Kangas 
Contractor:
Smith Paving Inc
4090 US41 W. Marquette, MI 49855
http://smithpaving-mi.com/
1-906-228-7285

Spring Completed
MQ13-022

Westland Drive Reconstruction
Project Engineer:
Inspector:
Contractor

Drawings:
Drawing 21


Spring Completed
Project Number 2013 Project Name Start Date End Date
MQ11-019 Mesnard Street Sidwalk (Safe Routes to School)
Overview Map
Drawing 3
Drawing 4
Drawing 5
Drawing 6
Drawing 7
City Engineer: Keith Whittington
Project Engineer: Mik Kilpela
Inspector: Jared Kangas

Contractor:
U.P. Concrete
1438 U.S. 2-41 P.O. Box 25
Bark River, MI 49807
April 15
2013
COMPLETED
MQ08-025

EAST WASHINGTON STREET  RECONSTRUCTION
Overview Map
Drawing 4

City Engineer:  Keith Whittington
Project Engineer:  Greg Borzick  
Inspector:  Mik Kilpela

Contractor:
Oberstar, Inc
1900 Industrial Parkway
Marquette, MI 49855
(906) 226-6799

April 29
2013

COMPLETED

MQ11-500

PRESQUE ISLE MARINA PHASE 1
Overview Map
Drawing 2
Drawing 3

City Engineer:  Keith Whittington
Project Engineer: Jim Compton
Inspector: Jim Compton

Contractor:
Veit and Company, Inc
14000 Veit Place
Rogers, MN 55374
(763) 428-6749
May 5
2013
COMPLETED
MQ11-023

ALLOUEZ ROAD RECONSTRUCTION
Overview Map
Drawing 3
Drawing 5
Drawing 9

City Engineer:  Keith Whittington
Project Engineer: Mik Kilpela
Inspector: Mik Kipela

 Contractor:
Oberstar, Inc
1900 Industrial Parkway
Marquette, MI 49855
(906) 226-6799

June 19,
 2013

COMPLETED

MQ11-024

ALTAMONT STREET RECONSTRUCTION
Overview Map
Drawing 20
Drawing 22
Drawing 24

City Engineer:  Keith Whittington
Project Engineer: Greg Borzick
Inspector: Dan Salmon

Contractor:
Oberstar, Inc
1900 Industrial Parkway
Marquette, MI 49855
(906) 226-6799

July 8,
 2013

COMPLETED

MQ11-021

CEDAR STREET RECONSTRUCTION
Overview Map
Drawing 20
Drawing 22
Drawing 24
Drawing 25
Drawing 27

City Engineer:  Keith Whittington
Inspector: Matt Koss

 Contractor:
Smith Paving, Inc
4090 US 41 West
Marquette, MI 49855
July 19
2013
COMPLETED
MQ12-018

SIDEWALK REPAIR CONTRACT
(Problem Areas)

Overview Map
City Engineer: Keith Whittington
Lead Inspector: Matt Koss

Contractor:
Arrow Constructions
422 US-41 E
Negaunee, MI 49866

Summer
2013

COMPLETED

MQ12-021

HIGH STREET RECONSTRUCTION
Overview Map
Drawing 10
Drawing 12
City Engineer:  Keith Whittington
Lead Inspector: Jarod Kangas

 Contractor:
Smith Paving, Inc
4090 US 41 West
Marquette, MI 49855

Sept
2013

COMPLETED

MQ12-023

EAST AVENUE SANITARY SEWER PROJECT
Overview Map
Drawing 4
City Engineer:  Keith Whittington
Lead Inspector: Jarod Kangas

 Contractor:
Smith Paving, Inc
4090 US 41 West
Marquette, MI 49855

July 19
2013

COMPLETED

MQ12-101 Street Improvement/Bituminous Paving (SIMP) TBD TBD
MQ12-301

SANITARY SEWER CLEANING AND TELEVISING CONTRACT
(Problem Areas)
Overview Map
Project Engineer:   Keith Whittington

 Contractor:
Great Lakes TV Seal, Inc
3600 Kewaunee Rd
Green Bay, WI 54311

Summer
2013

COMPLETED

MQ12-302

SANITARY SEWER ROOT CONTROL CONTRACT
(Problem Areas) 
Overview Map
City Engineer: Keith Whittington

Contractor:
Duke's Root Control, Inc
1020 Hiawatha Blvd. West.
Syracuse, NY 13204

Summer
2013

COMPLETED

MQ12-305

SANITARY SEWER Cured-In-Place PROJECT
(Problem Areas)
Overview Map
Project Engineer:   Keith Whittington

Contractor:
Insider Forms Technologies, Inc

Summer
2013

COMPLETED

Project Number 2012 Project Name Start Date End Date

MQ10-102

MQ11-025

FOREST PARK DRIVE, MILDRED AVENUE & WILSON STREET

RECONSTRUCTION PROJECTS

Overview Map

Forest Park-Drawing 1

Forest Park-Drawing 2

Forest Park-Drawing 3

Forest Park-Drawing 4

Mildred-Drawing 1

Mildred-Drawing 2

Mildred-Drawing 3

Wilson-Drawing 1

 

Resident Engineer:  Keith Whittington
Lead Inspector:  Dan Salmon & Jared Kangas

 Contractor: Associated Constructors LLC.
14 Industrial Park Drive Negaunee, MI 49866

http://www.acmqt.com/
1-906-226-6504

Spring/Summer 2012 COMPLETED
MQ10-303

MATTSON PARK LIFT STATION

REPLACEMENT PROJECT

Drawing

 

Resident Engineers:  Jim Compton
Lead Inspector: Jim Compton

Contractor: Smith Paving Inc

4090 US41 W. Marquette, MI 49855

http://smithpaving-mi.com/
1-906-228-7285

March 2012

COMPLETED

MQ91-029

MCCLELLAN AVENUE EXTENSION PROJECT

(Fair Avenue to WrightStreet)

Drawing 1

Drawing 8

Drawing 10

Drawing 12

Drawing 14

Drawing 16

Drawing 18

Drawing 20

Drawing 32

Drawing 39

 

Resident Engineer:  Greg Borzick
Lead Inspector:  Mik Kilpela

 Contractor: Oberstar Excavating, Inc.

1900 Industrial Prkway, Marquette, MI 49855

http://www.oberstarinc.com/
1-906-226-6799

Spring 2012

COMPLETED

MQ11-301 SANITARY SEWER CLEANING AND TELEVISING CONTRACT
(Problem Areas)

Overview Map

Resident Engineer:   Keith Whittington

 

Contractor: Plummer's Environmental Services, Inc

10075 Sedroc Industrial Drive, Byron Center, Michigan 49315

http://www.plummersenv.calls.net/

1-888-801-5104

June 2012 COMPLETED
MQ11-305

SANITARY SEWER SLIP LINING PROJECT

(Problem Areas)

Overview Map

Resident Engineer:   Keith Whittington

Contractor:  Insituform Technologies USA LLC.

17988 Edison Avenue, St. Louis, MO 63005

http://www.insituform.com/

1.800.234.2292

June 2012

COMPLETED

MQ11-018 SIDEWALK REPAIR CONTRACT
(Problem Areas)

Resident Engineer: Keith Whittington
Lead Inspector: Matthew Koss

Contractor: U.P Concrete

1438 U.S. 2-41 P.O Box 25 Bark River, MI 49807 .

http://www.upconcrete.com/

1-906-466-7400

June 2012 COMPLETED

MQ11-101

MQ11-303

Street Improvement/Bituminous Paving in Conjunction With Sanitary Sewer Lateral Replacement

Resident Engineer:  Keith Whittington
Lead Inspectors:  Dan Salmon, Mik Kilpela, Jared Kangas

Contractor:  Payne & Dolan, Inc.

801 Clark Drive Gladstone, MI 49801

http://www.payneanddolan.com/

1-920-757-7535

June 2012 COMPLETED
Project Number

2011 Project Name

Start Date End Date
MQ05-032

LAKE STREET MULTI USE/BIKE PATH PROJECT

(Carp River to Hampton Street)

Overview Map

Drawing 3

Drawing 4

Drawing 5

Drawing 6

Drawing 7

Drawing 8

Drawing 9

Drawing 10

Drawing 11

 

Resident Engineer:  Greg Borzick
Lead Inspector:  Matthew Koss

Contractor: A. Lindberg & Sons, Inc.

599 Washington Street Ishpeming, MI 49849

http://www.lindberginc.com/

1-906-486-4459

 

COMPLETED

2011

NON CITY PROJECT

(MDOT)

MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT)

M553 NON MOTORIZED PATH

( West Side of 553 from Vistanna Drive to Grove Street)

Overview Map

For More Information Contact:  Keith Whittington

Spring/Summer

2012

 
MQ98-030

LAKESHORE BOULEVARD RECONSTRUCTION PROJECT

Overview Map

Drawing 3

Drawing 5

Drawing 7

Drawing 9

Drawing 11

Drawing 13

Drawing 15

Drawing 17

Drawing 19

Drawing 20

Drawing 21

Drawing 22

Drawing 23

Drawing 24

Drawing 25


Resident Engineers:  Mik Kilpela & Jim Compton
Lead Inspector:  Mik Kilpela

Contractor: Hebert Construction Company

107 4th Avenue Iron River, MI 49935

http://www.hebertconstructionco.com/
1-906-265-5157

 

COMPLETED

2011

MQ08-102 

ADAMS STREET UPGRADES
(Mesnard to Hampton)

Overview Map

Drawing 14


Resident Engineer: Greg Borzick
Lead Inspector:  Jared Kangas

Contractor: Smith Paving Inc

4090 US41 W. Marquette, MI 49855.
1-906-228-7285

 

COMPLETED

2011

MQ08-102 

GARFIELD AVENUE UPGRADES
(Jefferson to Sherman)

Overview Map

Drawing 22


Resident Engineer: Greg Borzick
Lead Inspector:  Jared Kangas

Contractor: Smith Paving Inc

4090 US41 W. Marquette, MI 49855.
1-906-228-7285

 

COMPLETED

2011 

MQ08-102 

FAIR AVENUE UPGRADES
(Lincoln to Norway)

Overview Map

Drawing 28


Resident Engineer: Greg Borzick
Lead Inspector:  Jared Kangas

Contractor: Smith Paving Inc

4090 US41 W. Marquette, MI 49855
1-906-228-7285

 

COMPLETED

2011 

MQ08-102 

BRULE ROAD UPGRADES AND WATERMAIN RECONSTRUCTION
(Joliet to Radisson)

Overview Map

Drawing 3


Resident Engineer: Greg Borzick
Lead Inspector:  Jared Kangas

Contractor: Smith Paving Inc

4090 US41 W. Marquette, MI 49855
1-906-228-7285

 

COMPLETED

2011 

MQ10-301 SANITARY SEWER CLEANING AND TELEVISING CONTRACT
(Problem Areas)

Project Drawing

Project Engineer: Keith Whittington

Contractor: Upper Peninsula Rubber Company, Inc

2101 North 19th Street Escanaba, MI 49829

http://www.upconcretepipe.net/index.html

1- 906-786-0460

 

COMPLETED

2011

MQ10-302

SANITARY SEWER ROOT CONTROL CONTRACT
(Problem Areas) 

Project Drawing

Project Engineer: Keith Whittington

Contractor: Duke’s Root Control, Inc.
1020 Hiawatha Blvd. West Syracuse, NY 13204

http://dukes.com/
Ph: 1-315-472-4781

 

COMPLETED

2011

MQ10-305

SANITARY SEWER SLIP LINING PROJECT

Overview Map

Resident Engineer:   Keith Whittington

Contractor:  Insituform Technologies, USA

 

COMPLETED

2011

  SIDEWALK REPAIR CONTRACT
(Problem Areas)

Resident Engineer: Keith Whittington
Lead Inspector: Matthew Koss

Contractor: Premeau Construction, Inc.
1-906-932-4314

 

COMPLETED

2011

 

STREET IMPROVEMENTS AND BITUMINOUS PAVING IN CONJUNCTION WITH SANITARY SEWER LATERAL REPLACEMENT
(Problem Areas)

Resident Engineer: Keith Whittington
Lead Inspector: Dan Salmon

Contractor: Payne & Dolan, Inc.

N3W23650 Badinger Road
PO Box 781
Waukesha, WI 53187
Phone - (262) 524-1700

 

 

COMPLETED

2011

  STREET CRACK FILLING (SIMP)
(Problem Areas)

Resident Engineer: Keith Whittington
Lead Inspector: Dan Salmon

Contractor: Scodeller Construction, Inc

51722 Grand River Avenue

Wixom, MI 48393-2303

Phone - (248) 374-1102

 

COMPLETE

2011

Return to Top of Page

Project
Number

2010 Engineering Projects Start Date End Date
  SIDEWALK REPAIR CONTRACT
(Problem Areas)

Resident Engineer: Keith Whittington
Lead Inspector: Matthew Koss

Contractor: Ruotsala Construction LLC
1-906-932-4314

 

COMPLETED

2010 

 

STREET IMPROVEMENTS AND BITUMINOUS PAVING IN CONJUNCTION WITH SANITARY SEWER LATERAL REPLACEMENT
(Problem Areas)

Resident Engineer: Keith Whittington
Lead Inspector: Mik Kilpela

Main Contractor: Payne & Dolan Inc.

Paul Bentley

1-906-228-5370

Sub Contractor: Oberstar

Gary Raffaelli / Gary Olivier

1-906-226-6799

 

 

COMPLETED

2010 

  STREET CRACK FILLING (SIMP)
(Problem Areas)

Resident Engineer: Keith Whittington
Lead Inspector:

Contractor:

 

COMPLETED

2010  

  SANITARY SEWER ROOT CONTROL CONTRACT
(Problem Areas)

Resident Engineer: Keith Whittington

Contractor: Dukes Root Control, Inc.
1-315-472-4781

 

COMPLETED

2010 

  SANITARY SEWER VIDEO CONTRACT
(Problem Areas)

Resident Engineer: Keith Whittington 

Contractor: Upper Peninsula Rubber Company
1-906-786-0460

 

COMPLETED

2010 

  CHAMPION STREET RECONSTRUCTION
(Genesee to Fisher)
Continued from Fall 2009

 Project Drawings:
Drawing 3
Drawing 6
Drawing 11
Drawing 13
Drawing 24

Resident Engineer: Keith Whittington
Lead Inspector: Mik Kilpela

 Contractor: Oberstar Excavating, Inc.
1-906-226-6799

 

 

 

COMPLETED

2010

  SEVENTH STREET EXTENSION
(Spring to Washington, Fisher Intersection)

 Project Drawings:
Drawing 27
Drawing 29
Drawing 32

Resident Engineer: Jim Compton  
Lead Inspector: Jim Compton

 Contractor: Hebert Construction Company
1-906-265-5157

 

COMPLETED

2010 

  ALGER STREET RECONSTRUCTION
(Fourth to Lee)

 Project Drawings:
Drawing 13
Drawing 16
Drawing 22

Resident Engineer: Keith Whittington 
Lead Inspector: Matthew Koss

 Contractor: Hebert Construction Company
1-906-265-5157

 

COMPLETED

2010 

  MILDRED STREET RECONSTRUCTION
(Gray to Kimber) 

Project Drawings:
Drawing 3
Drawing 9 

Resident Engineer: Greg Borzick
Lead Inspector: Matthew Koss  

Contractor: Hebert Construction Company
1-906-265-5157

 

COMPLETED

2010 

  CRESCENT STREET RECONSTRUCTION
(Third to Fourth and High to Spruce)

 Project Drawings:
Project Timeline
Drawing 5
Drawing 8
Drawing 11
Drawing 33
Drawing 34
Drawing 35

Resident Engineer: Keith Whittington
Lead Inspector: Dan Salmon

Contractor: Smith Paving Inc.
1-906-228-7285

 

COMPLETED

2010 

  PROSPECT STREET RECONSTRUCTION
(West Half of 100 W. Block and Spruce to Pine) 

Project Drawings:
Project Timeline
Drawing 17
Drawing 19
Drawing 21
Drawing 33
Drawing 34
Drawing 35

Resident Engineer: Keith Whittington
Lead Inspector: Jared Kangas

Contractor: Smith Paving Inc.
1-906-228-7285

 

COMPLETED

2010 

 
Return to Top of Page

Project
Number

2009 Engineering Projects Start Date End Date
MQ08-202

WRIGHT STREET WATERMAIN UPGRADE AND STREET SURFACE RECONSTRUCTION

 Project Drawings:
Drawing 3
Drawing 4
Drawing 5
Drawing 6
Drawing 7
Drawing 8
Drawing 9
Drawing 10
Drawing 11
Drawing 12

Project Engineer: Greg Borzick
Lead Inspector: Matthew Koss

Contractor: Associated Constructors LLC.
1-906-226-6504

 

COMPLETED

2009

MQ08-020 WEST MICHIGAN STREET RECONSTRUCTION

 Project Drawings:
Drawing 3
Drawing 5
Drawing 8
Drawing 16

Project Engineer: Keith Whittington
Lead Inspector: Jared Kangas

 Contractor: Smith Paving Inc.
1-906-228-7285

 

COMPLETED

2009

MQ07-023 WATER AND SANITARY SEWER TRANSMISSION MAIN REPLACEMENT

Project Drawings:
Cover
Drawing 2
Drawing 3
Drawing 4 

Project Engineer: Keith Whittington
Lead Inspector: Jared Kangas

Contractor: Smith Paving Inc.
1-906-228-7285

 

COMPLETED

2009

MQ08-302 SANITARY SEWER ROOT CONTROL CONTRACT
(Problem Areas)

 Project Drawing

Project Engineer: Keith Whittington

Contractor: Downunder Municipal Sales
1-269-344-0127

 

COMPLETED

2009

MQ08-301 SANITARY SEWER VIDEO CONTRACT
(Problem Areas) 

Project Drawing

Project Engineer: Keith Whittington

Contractor: Great Lakes TV Seal, Inc.
1- 920-863-3663

 

COMPLETED

2009